What to Expect During a Professional Epoxy Installation

Most epoxy installations take 1–3 days. Here’s the process:

Day 1: Preparation

  • Diamond grinding

  • Crack and chip repair

  • Concrete cleaning and moisture evaluation

Day 2: Basecoat & Broadcast

  • Apply epoxy base

  • Add flakes, quartz, or pigments

Day 3: Topcoat

  • Apply UV-stable protective layer

  • Final inspection

  • Cure time begins

You'll receive care instructions to ensure long-term success.

Previous
Previous

Common Mistakes Homeowners Make When Choosing Epoxy

Next
Next

The Ultimate Guide to Epoxy Flooring for Southwest Florida Homes